How to calculate the Water cement ratio of reqiured
compressive Strength of concrete?
Answer Posted / yoga annad
i really dont know pls mail me the correct answer with
calculations for 1:2:4 mix, 1;1.5:3mix, 1:4:8mix.including
volume of cement, sand ,aggregate.thank u.
| Is This Answer Correct ? | 56 Yes | 24 No |
Post New Answer View All Answers
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
What materials were used to build the golden gate bridge?
Types of column foundation and how to calculate its steel quantity.
Dear Sir I Mahesh C. Bhamre have already given a Exam for Superintendent Officer / Public relation Officer Exam Dharmday Aaukta held at Nashik on Date 29/08/2010. My seat no was 5040247. and my cell no is 9822677994. and my mail Id is - mahesh.bhamre@rediffmail.com So can you pl send me details of result of respective exams. Thanking you in Anticipation.
Calculation of curtain wall of box culvert
What is a bearing capacity of soil?
if the nitrates more than 45mg/l in water lead to disease then what is it called
What is an object snap mode?
in a corner footing of a building, column lies in one corner. in this condition i want to know if the reactive pressure of soil will be uniformly distributed throughout the footing or will be uniformly varying as in the case of eccentrical loading.
Slab quantity
What are the techniques to measure road difference?
I want to know how much the lapping length for the pilecap reinforcement.. we r using single pile cap which is 24mby54m and 2.5m depth.. total 91piles are supporting the pile cap.. how to do a steel reinforcement??
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
in one SQM plaster how much Cement and sand consumed in ratio 1:4