How to start testing after project kick off ???
Answer Posted / manijanmi
Testing - meaning application testing starts after the
first build arrives. At project kickoff stage, there is
info avaliable on the product concept and some
functionalities of the product. At project kickoff the
product, the methodology, project monitoring and control,
and build management is dicussed. Subsequent to this QA
analyses the product and technology requirements and
identifies the resources to test. QA then draws up a
preliminary QA effort estimate. As more information becomes
available, it is analysed and reveiwed by QA and the QA
estimate is updated.
| Is This Answer Correct ? | 8 Yes | 4 No |
Post New Answer View All Answers
What is a ‘use’ case and what does it include?
is possible smart identification through descriptive Programing
How frequently is your project audited? How do you know the result of these audits?
pls post the questions for qa position in factset
What is automated software quality (asq)?
Will automated testing tools make testing easier?
Explain the steps for bug cycle?
Diffrence b/w compiled module and shared repository?
When we should continue testing?
Why we do load and performance testing?
What if there is not enough time for thorough testing?
-What do you think about unit testing? -How do you assure quality of the code you release? -How do you release software?
Define the role of qa in software development?
Can Parrto Principle be used in Quality Assurance and testing?
What is capture/replay tool?