Answer Posted / guest
Of course to get tasks in the military completed you have
to work with all keeps of different people and they all
have a part to do. Be positive with everyone and the job
will get done.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How to make tiles floor step by step procedure?
Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish
please send me bhel questions on rupesh.017@rediffmail.com
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')
What are the uses of alloys in daily life and how are alloys made?
Define graphics window?
pls tell me about method of cutting length of ties column
How does a traffic light signal work ?
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
Technical Question of Civil Engineering
what are the code used for residental building?
What is the difference between Grade I, II and III of GSB?
what is the specific gravity of rubble in plum concert
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
why demand factor less then 1 ?