I have a 600VA UPS for computer only. It holds for
20minutes only.
1. Can it be upgraded for longer period.?
2. Can it be used for one ceiling fan and a tube light? If
yes, how to upgrade?
Answer Posted / ranjit kumar mallick
Of course you need to put a higher amp/hr battery but you
need to check the amp rating of transformer as well as the
MOSFET because after complete discharge battery will demand
higher current for charging and in that case MOSFET must
withstand that high current otherwise it will heat up and
burnout.
Is This Answer Correct ? | 23 Yes | 6 No |
Post New Answer View All Answers
What are the transformer losses?
How to determine the breaking capacity such as break down current and break down voltage for VCB and CT's.
How work of capacitor in dc supply...???
An ISP is granted a block of addresses starting with 150.80.0.0/16. The ISP wants to distribute these blocks to 2600 customers as follows. a) 200 medium size businesses; each needs 16 addresses b) 400 small businesses; each needs 8 addresses c) 2000 households; each needs 4 addresses Design the subblocks and give the slash notation for each subblock. Find out how many addresses are still available after these allocations.
how many current required for hypo test
draw the block diagram of fire alarm?
What are marginally stable systems?
What is state space method ? Why its used ? Can it applicable on linear, non-linear, 1st order, higher order, homogeneous, non-homogeneous, open-loop , closed loops , stable & unstable systems ?
In siemens S7-300 PLC, what is function and function block ? What is the difference between them ? When to use function and when to use function block ?
why servomotor motor? where i apply for best output?
how to calculate the capacitor to maintain power factor?
what are the range of memory address in plc for L&T lx7 4A
can anybody send the rrb chennai &rrb bopal question papers of 2006&2007.My exam is on 12 oct 2008.Its urgent
how to calculate voltage drop and followed by cable calculation?is there avail in formula?
HOW TO CALCULATE THE HEAT AND LOAD OF LT-SUBSTATION WHICH CONTAINS 2*1MVA TRANSFORMERS,LT SWITCH BOARD,MLDB,ACB,BUSBAR,ETC...?