Answer Posted / mahalingan/vinoth
qa: quality assurance
this is carriedout by the clients with help of codes
and standards to inorder to give assurance for the design
period.
qc:quality control
this is carriedout by the contractor with the help of
approved QUALITY ASSURANCE PLAN AND PROCEDURES.
| Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
why we r recommended for pre-action sprinklers @ generator/tx/mv panel room. If any leakage there,that panel will damage. So what is the Logic for pre-action sprinklers there?
what are the activities to be done after a steam turbine trips?
What is the function of thermostat in cooling system of an engine ?
Purpose of stern tube sealing
good book for material science and catia v 5 high scope domin to make career
draw p-v dia distingshing naturally aspirated and supercharged engine with reference to pumping loss?
What are four types of turbine seals?
[lease send recent question papers of rrb in junior engineer
What is short cycling in refrigeration system?
Explain nuclear reactor?
Please tell me the difference between EN31 and OHNS material.
What is the normal vacuum pressure in a steam turbine atmospheric condenser? What would cause the press to falls?
sir, I am applied RRB chennai,MMV(mechanical),Pls mail 2006,2007 & 2008 years solved question papers.My Mail jrks@rediffmail.com
please msg me tecnical question of hpcl
What is difference between ASME EN & IS related welding procedures(WPS/PQR/WPQ)