Answer Posted / ranvijay
QA- QUALITY ASSURANCE
QC- QUALITY CONTROL
| Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb
• Why not 4 phase & 5 phase
Why tampering to be done?
What is the use of metal jack plane?
What is meant by indirect contact heat exchanger?
What is the pressure of fuel oil on main engine and diesel generator?
please send me previous placement papers of cummins company
hi gys.. I too want sample papers of hpcl(mech) please help me......plz..... mail me dnaik2006@gmail.com
Gegger is used in foundry for the purpose of____________
What color are thermal oil piping lines?
why constant pressure is consider for thermal diffusivity??
What do you treat in high alkalinity of boiler water?
Specific strength of materials is very high when they are in fibre size but lower when they are in bar form why ?
What is meant by reflectivity?
What is the structure of pure iron and whether it is soft or hard ?