Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

In all the generators, the excitation supply is DC. What is
the significance of DC excitation? What will happen if AC
supply is given as excitation supply?

Answer Posted / don

THERE WILL BE NO DEFINITE POLES IN ROTOR,ALSO THE EDDY
CURRENT LOSSE WILL BE MORE IF AC IS GIVEN AS EXCITATION.

Is This Answer Correct ?    1 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is plunger and what's the use of it in motor alignment?

2697


why we are not giving the zone 1 trip command to the master trip relay

1796


what is the value of combined earthing in general electrical circiut?

1952


What is the rating of a circuit breaker needed for 300 kv load in 33KV supply line of 33/415 transformer ? Whether 800/1200 amp vaccum circuit breaker can perform for a 33 KV line in input in 415 volt in output of the transformer ?

1723


We have 90mX100m hangar with 16 no.of supporting pillar. It is required to provide power supply on all pillars. what is suggested earthing scheme for hangars.

2056


Why do we pefer VCB over OCB?What are the advantages of VCB over OCB?

2677


In the ACB breaker capacity is 2000Amp but this each phase taken 1250 But total beldibg load is 600amp or 700amp watt is the problem

2016


i m electrical diploma holder i want to do plc $ Scada some body tell me which insitute is best for me near chandigarh

3155


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

1841


What is the formula to find out two phase active & reactive power

2233


Why do not we prefer non conventional sources of energy to conventional sources?

1244


can we make a electric generator,which can not use any type of fuel,air,solar,gas,thermal,coal,petrol,etc and able to produce electrical energy (or self electricity generating generator)

1983


how to handle 2500 kva transformar

1678


how to calculate the torque of a motor?

2183


Why it need to form a capcitor when it not been in use from three or two year. Plz describe it technically.

1983