Answer Posted / thowsif_emerson
The first-pole-to-clear-factor (kpp) is dep
The first-pole-to-clear-factor is used for calc
three-phase faults. In general the following cases apply: -
kpp = 1.3 corresponds to three phase faults in systems with
an earthed neutral. - kpp = 1.5 corresponds to three phase
faults in isolated
- kpp = 1.0 corresponds to special cases, e.g. two-phase
railway systems.
arth in a syst
A special case is when there is a three-phase fault without
involving e
not normally considered in the standards.
| Is This Answer Correct ? | 6 Yes | 8 No |
Post New Answer View All Answers
State any two nuclear power stations in India, with their generating capacity.
how to select the no. of brushes in a lap winding?
What is difference between slip rings and carbon burushes?
What is an order of a system.
Enlist four components of electrive drives.
What is the comparison of PILC and XLPE cable
why u r living from presentaly working.
Difference between control junction box (cjb) and power junction box(pjb)?
for what voltage will reactive power be largest in 380 kv line : a) 375kv b)380kv c)385kv
explain wiring system
Do any one know exacatly when the results for NHPC held on 8th march 09 for engineering trainees will be released ?. if so please post it, i'm eager to know it.
WHAT IS IM (INDEX OF MOUNTING )IN MOTORS
Is there any specialised book to refer about fault level calculation both in MV and LV side??
We have drive feeding an output contactor for a 5000 hp motor @ 5kV application. The motor FLA is 629amps x 1.25% service factor = 786.25 amps The cable that we current have in place between the drive and the output contactor is 350kcmil- MV-105 (parallel cables). Per the NEC table 310.60 (C) (69). This show the cable ampacity is at 615 amps per cable for a rating of 1230 amps. We have derated the cable for the cable tray and the multiple cables application and our calculations show that after the correction factor factor we are at 922amps. 1230 amps x .75% correction factor factor = 922.5 amps. The customer is driving us to then use another safety factor of .25% off of the already derated cable. Can you please provide a longhand calculation for your solution on this application?
How to calculate mf when meter equipment and meter are connected