What will the effect on a motor designed at 60 HZ, and
operated on 50 HZ ??
Answer Posted / baskaran.r
when operating 50 hz the important change is voltage. we are
to make V/F as constant ie voltage /frequency equal there
fore to operate the motor in 50 hz we have to reduce the
voltage per v/f calculation. if operated with same voltage
the flex will saturate and motor will take high amps and
burn the speed will reduce to 1500 as stated.
| Is This Answer Correct ? | 8 Yes | 5 No |
Post New Answer View All Answers
What is the difference between PS & metering CT (5p20,0.5 etc.)? Why in PS class CT only Vk is given ? Is PS class CT is more accurate than metering CT?
how to calculate the formula of cable size if motor kw is given
What is CCT (Correlated Color Temperature) ?
why the rotor current becomes in steady state during high slip region? please verify with equations.
Why L.T.Cable voltage rating is 1.1kV,where as system voltage is 0.415kV?
I have a current transformer with 1 main reading meter with transformer outside the building and a control panel having 5 CT reading meters with black round coils inside the building. I want to know, A) when current pass through the Transformers, will the current be reduced or be the same and after that B) when current pass through the CT meters with black round coils, will the current be reduced or be the same. C) in the above process will the reading of the main meter be same or different, from the total reading of all the 5 CT meters.
Compare salient pole and cylindrical rotor machines.
battery capacity use of made?
is it possible to test of bus bar in high rise building without completed full floor ?
how the synchronizing is obtained at bus couplers in grid substation? (because there we cannot change the frequency in one of transmission lines like in generator synchronization)
Explain Continuous and Discrete signals?
what is earthing transformer? draw the winding dia.of earthing transformer.
Why Neutral Isolation is required?
We normally make oil soak pits under Transformers. Oil from soak pit goes to collection pit. We provide granules/pebbles under transformers. My question is weather granules/ pebbles to be filled in soak pit or not? if yes upto what level?
What are the necessary components of the feedback control system?