Do you know differenence between design mix and nominal
mix?

Answer Posted / adersh v s

Nominal mix means mixing cement, fine aggregates and coarse
aggregates based on volume
Eg: 1:2:4 mix means mixing one volume of cement with two
volumes of sand and four volumes of coarse aggregates.This
is normally used when the the volume of concrete work to be
done is less.
Design mix is a trial and error procedure.Here the
characteristics of the aggregates cement and water used for
concrete is first analysed and these are mixed in ratio of
their weights and is tested for the design strength.Here
better quality control is maintained and also the
unnecessary wastage of materials is less.

A Design mix is that mix which uses minimum quantity of
components to attain the designed strength of concrete
whereas in a nominal mix attanining the characteristic
compressive strength is the criteria of mix proportioning.

Is This Answer Correct ?    40 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why is M30 grade Concrete use for Foothing & Column M50

2977


How to do base isolation for RC framed structure using ETABS software?

3728


What is the zero value in quantity surveying

2004


Define What are the materials used in building a gravity dam?

726


What is different between DI Pipe and CI pipe?

1574






Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 mĀ³/year, and UFW of 12%.

656


how to calculate the scour depth

2338


How much is the cover for slab?

722


Explain the water bound macadam roag

2248


What is difference between combin footing & rapt footing

1121


what is the composition of good brick ?

1454


i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh

1831


List out the types of roofs?

665


how to take the quantity of block work and plasteringĀ  1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate

2040


How do we calculate absolute pressure?

764