Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why fuse is not used in neutral...

Answer Posted / tushar gawas

as the supply is alternating in nature,hence if anyone
return path gets disconnected under fault condition the
supply gets disconnected.since phase carries vtg which
melts fuse element under fault condition so fuse is used in
phase.

Is This Answer Correct ?    7 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Does the direction of rotation of d.c. Shunt motor would get reversed if the armature current and field current both are reversed?

1154


Refernce currents are to be generated using refernce cueernts how can this be done??

2004


mccb service sittings be done?

1811


why u r living from presentaly working.

2570


what are the usual topology of transformers at different substations in the power system and why that particular topology is choosen. what are the limitaions of that topology?

2123


Please help me regarding my one concern. - During earth pit testing we noticed that the Clean earth pit and dirty earth pit showing continuity (Resistance value - 5ohm) . I want to know that if both earth pit have separate location and there is not internal looping between PIT then why such continuity is showing on it . Because of this issue the field side all earthing point showing short. In PLC panel we are providing two types of earthing cable which is coming from separate earth pit (Clean and Dirty earth pit) because of earth PIT showing short our PLC is not complying spec . please help regarding this issues.

1590


what is formula to cal cute earth pit numbers and size of earth strip used in earthing?

2216


what is the difference b/w UHVDC and HVDC(LIGHT)?

6772


generally in LT and MV motors we are using 3.5Coresx16,25,35,50 etc cable for supply.although motors is earthed at two point and having all protection.then why we are using that 1/2 core for earthing the motors.while in HT cable we are using only 3core cable for motor supply.generally lt and mv motors are delta connected and ht motors having star connection.whethere it is having any relation with winding connection( star or delta).all motors i am talking about are dol only.can anybody solve my confusion.thanks...

1921


How to calculate Ith (I thermal) for curent transformer

2081


What Normal(Tangent) towers and Tension(Cut-point) Towers?

6218


what is the write prosidure of stringing of 8meter pcc pole.

2454


A generating system will have a total capacity of 300 MW. Find the probable forced outage when the capacity is supplied by two 150 MW units. The operating probability of all units is P=0.98 and forced outage probability rate Q =0.02 .

2637


A 3-PHASE TRANSFORMER IS USED TO STEP-DOWN THE VOLTAGE OF A 3-PHASE, 11KV FEEDER LINE. PER-PHASE TURNS RATIO IS 12.FOR A PRIMARY LINE CURRENT OF 20A, CALCULATE THE SECOUNDRY LINE VOLTAGE, LINE CURRENT AND OUTPUT KVA FOR FOLLOWING.A)STAR- DELTA.B)DELTA-DELTA.

3061


what is the formula for computing cable tray size & capacity

2168