Answer Posted / sidhartha
it is a time from request to the time when its first bit of
response will receive.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is quality management?
What is negative and positive testing?
How would you estimate the amount of re-testing likely to be required?
what is the difference between the normal testing and embedded testing?
What determines the level of risk?
In the 7 Stages of the SDLC (Planning, System Analysis, System Design, Development, Testing, Implementation, and Maintenance), WHO are the stakeholders of each stage?
I am having 1.5 years of exp. in Manual testing.What I have to do now? Should I do ISTQB Certification or Perl/Shell Scripting Languages? OR Anything else.Please Guide me properly.
What is quality assurance (qa)?
What is Multipath I/O?s
What is v&v?
Explain black-box testing?
hi everyone i want to download test director,winrunner,qtp latest versions pls help me
What is the one key reason why developers have difficulty testing their own work?
What is sei - software engineering institute?
What makes an inspection different from other review types?