Answer Posted / kiran punalur
B..because it stands in between A and C ..A/C
Is This Answer Correct ? | 19 Yes | 1 No |
Post New Answer View All Answers
on what basis the partial factor of safety are decided? form the load combinations
Explain what are the phases inspections are done by local authority while construction?
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
how do you calaculate the total steel quantity of an rcc building using thumb rule?
What are your goals?
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
How to calculate 1 brss for RCC work
what does the grad of cement shows (denotes)?
Does brick grows bigger every year?
Permissible wastage of cement as per IS code ? In which IS code I get it?
List out some of the checking’s, done at the completion of construction?
(Project Management Topic) What are the important criteria in the successful realization of the project?
How can I make justification between using concrete grade c35 compare c37?