Answer Posted / m pramod r
for adding a new site first of all,go through the BSC,findout the Capacity of BCSU Card is there any space to add a new site if it is than first install hardaware for the BTS than take a E1signal from the BSC to that BTS.do all the Software process through the terminal.
| Is This Answer Correct ? | 19 Yes | 0 No |
Post New Answer View All Answers
Why making capacity of the circuit breaker is higher than breaking capacity?
What is RX lev sub & Rx lev full
Guroscope works on the basis of what?
describe the various addressing modes of 8085 processor, also provide an example of each.
Explain how to convert a jk flip flop into sr flip flop and vice versa, a sr flip flop into d or t flip flop and vice versa?
wat is the channel length we r using in ic designing in current technology
Draw the circuits of cb, ce and cc configurations using npn transistor.
hi i am electronics & telecomm engg & appling 4 the AAI jr executive (electronics/ATC) written test. pls forward me the syllabus & old question papers.I will be very much thankful to you. das.nilanjana2000@gmail.com
Name some of the current controlled (current driven) devices?
What is the effect of temperature on extrinsic semiconductor?
send me syllubus of AAI exmatation
how a dpad circuit works
Define breakdown voltage.
What is half duplex transmission?
Explain the difference between latches and flip flop?