Is 456 revised lastly in which year? & What are the revisions?
Answer Posted / gang
IS 456 has been revised in 2000
| Is This Answer Correct ? | 68 Yes | 5 No |
Post New Answer View All Answers
What expenses counted in contingencies and how much it is in related to built-up area of the building.
What are the applications of cad?
What is the difference between one-way slab and two-way slab?
Why are separation membranes used between concrete pavement slab and sub-base?
Why joints are provided?
significance of specific surface area of particles?
How and where are aqueducts built?
Water filter calculation formula
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
Moisture content calculation for diff mix ratio's ??
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
What do we mean by partial moment release ??
How many axes do cartesian coordinate system has?
How do you calculate reinforcement weight of steel?