plz tell me the V model with complete explanation(not
definition)
Answer Posted / rajendra
V - model :verification and Validation model.
It is the best model than the all other old development
and testing models.
Actually V-model is highly improved model for fast
application or product development.
V-model looks like
BRS Acceptence Testing
\ /
SRS system testing
\ /
HLD system integration testing
\ / STLC
SDLC LLD Component Integration Testing
\ /
Coding Unit testing
\ /
Testing
V-model spilts the testing into two parts design and
development.
Test design is done in early and test execution done at
end of testing
This enables the testing team to review and improve the
test cases.
verification and validation processes will be done
parallely.
In old conventional waterfall model testing is end cycle
activity.
Right side part majorly involes in Software development
and Left side part majorly involves in Software Test life
cycle.
And also one more important thing is right side half of the
V-model resembles like waterfall model.
As every body knows that waterfall model has no back
tracking to correct the defect occured in the previous
phase of the development.The defect resolving task will be
postponed to next release.
byee friendz,
if you have still any doubt
feel free to contact me by Mail or call
Rajendra Prasad Reddy
rajendra_penumalli@yahoo.com
9885162742
hyderabad
| Is This Answer Correct ? | 13 Yes | 3 No |
Post New Answer View All Answers
what are the functional test cases for enter user name,enter pass word,click on ok(only functional test cases)
Tell me the SRS based review,brs based review
Explain about PET Model?
What are the typical risks that you identify during test planning and their mitigation plan and Contengency plan.
What's the difference between alpha and beta testing?
Describe any bug you remember. Plz Give some real examples
What is testing and maintenance?
What is state transition?
Beyond the customary advantages of having a testing group, what are the benefits does a company receive from a well run, automated testing group?
What is baseline testing?
A defect which could have been removed during the initial stage is removed in a later stage. How does this affect cost?
Why is software testing required?
what are the various techniques you will use as soon as the srs was given to you to speedup the testing?
What are the cases why parameterization is necessary when load testing the Web server and the database server?
About Testing