Answer Posted / mukul chand
The scaffolding is a temporary structure (usually of timber) having platform raised for the workers as the construction increases in hight.
| Is This Answer Correct ? | 10 Yes | 0 No |
Post New Answer View All Answers
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low
How much material will consume for following specification water tank (9*7.5*6 feet)?
detailed calculation of the amount of cement used?
In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?
what does the grad of cement shows (denotes)?
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
which type of instrument included in plumbing work?name of instrument?
What is the strength of 1:6:12 mix?
what is right & short method of measurement of slab&beam
How you can use different dimension tools in cad? What are the different dimensions available?
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
When column of building is abutting the boundary line,then suitable footing advised is
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
natucher of concrete &type of concrete?