what is poissons ration of steel?

Answer Posted / s.srinivas

The ratio between the contraction at right angles to a
stress and the direct extension is called the poissons
ratio. Its value for steel is .25 - .30

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Why are pull-out tests performed for soil nails?

747


if dia of slab beam bar is38mm what its clear cover any method of provide clear cover

1631


can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???

1442


what post do you prefer to work in this company and why do you think you can serve better in such position?

2232


In a concrete grade C35A, C & A stands for what and equalent cube strength?

3106






Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method

1172


for pretensioning which will yield first and same for post tensioning?

1703


Critical Path Method is...

1574


I need to do a Compressive Strength Test for a specimen made of Rubber. Before doing the Test on the Machine, I need to have an idea of the Minimum and Maximum Compressive Strength or Yield Strength of the specimen. How can I calculate that?

1229


What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?

2228


What is the different type of slump test indications?

663


Technical Question of Civil Engineering

1888


1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?

2018


how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.

10575


I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations

1026