Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

A heater capacity is 3.0 KW on 415V . if supply voltage is
380Volt . what is heater capacity on 380volt . and how
calculate and give formulas . Prakash veer singh
Roto power Engg.

Answer Posted / v

Heater will take more current than it was taking before and
it's losses will increase.However it will give same output
as was giving but with increased lossess and get overheated
soon.

Is This Answer Correct ?    8 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how much cable size required for 70 kilowatt load.

1682


What is the current carrying capacity of 0SWG,3SWG,10 & 12 SWG solid bare overhead copper conductors?

3448


A 400KVA transformer has 400 Hz frequency. If the frequency is changed to 50 Hz, then what will be the new KVA rating?

1795


What is Load sharing of Transformer ?

2036


What are the characteristics of negative feedback?

1064


Why there are some equipment(i.e:TV) that using 2-pin plug instead of three? What happen if there is current leakage? Are we going to get electric shock??

2193


how we decide the require size is this for a known current at fuu load?

1964


what is a bus post insulator? explain its application in a substation.

12604


Is it required to lay GI wires along with GI/MS conduits from one point to another point though separate earthing cable is conncted from DB to Socket?

1998


What are the Formula of computing Back up Time of 500kVA UPS with 4 Battery Banks, each bank composed of 43 pcs of Batteries 12V150Ah. How to compute the Back up Time of UPS? We have also 3X500kVA UPS running in Parallel same composition as I write above.

1347


importance of reactive power management

2031


what is the id1 & id2 setting in differential protection relay of CSPC?

2793


How to calculate mf when meter equipment and meter are connected

1734


HOW TO CALCULATE THE HEAT AND LOAD OF LT-SUBSTATION WHICH CONTAINS 2*1MVA TRANSFORMERS,LT-SWITCH BOARD,MLDB,ACB,BUSBAR,ETC,......?

2098


we have provided 30 nos. relay contacts in panel.I want to know how do we do the numbering for the relay contacts as per any applicable standards

2009