Answer Posted / bembol rocco
super structure is the part of the stucture which is above
the ground level. am i correct? comment please....
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
What is the worlds largest concrete dam?
What is the sugested procedure of water purification for public supply?
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
Why should pumping be not used in case of concreting works?
what is work of planning deptt. in any construction compny (in road project)
Explain the design for rcc multi-storied building?
Water filter calculation formula
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
how to calculate freeboard in under ground water tank and technical details
How much the quantity of Dry material of Crush for 1:2:4 Concrete, using pan 3/8'' down....
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
What is the density of DLC & PQC and how it is differ from normal concrete?
how water proof chemicals act in concrete to avoid leek?
How to calculate cement and river sand material Qty for waterproofing base coat and finish coat