whats diffeence between dcs & scada operation.
Answer Posted / nagarajan singapore
DCS is nothing but distributed control system which is
controlling all parameter by distributing data to separate
unit from the master data base along with the field
bus .this is indeppedent control system.
SCADA is supervisory control and data acquistion system
which is monitor based control from plc i/o .this one
deppendent control control system by controlling a limited
control
| Is This Answer Correct ? | 17 Yes | 0 No |
Post New Answer View All Answers
how to relay switch sense the fault?
what is compensation? temprature & pressure
Hook up resistance decade box to temp.transmitter.
What is feed factor and its Importance in cement industry? How we can solve feed factor?.
full process of gas turbin?
What are the application of bernoulli’s theorem?
How to Calibrate Vibration Probe (Axial, Redial) in field
how many types of viberation transmitter and how to calibrate and where use of vibration transmitter
What is Droop? What is Step/Gradient Limiter in Turbine Governor control?
Im having problems with interfase betwen SPI v7.0 and SPPID v5.05. Previous versions of Intools shoul be fixed with SPPIDproj.ocx file. It was necessary to replace this file with one that allows the connection between different versions of SPPID. It is necessary in the current version to do the same?Thanks
I have energy meter for educational project having 0.5s class but my friend need 0.2s class meter , which one is good for that purpose and what is the actual difference of that two classes , need very easy example also.??
Introduce yourself which is not present in your biodata?
tell me the field & lab calibration procedure step by step with diagram of pressure gauge, pressure switch, pressure transmitter, temperature switch, level switch, flow switch, flow transmitter, temperature transmitter, temperature indicator, flow indicator, level indicator, control valve, thermocouple, pressure indicator (digital & analogue),
Please send me the sample question of Instrumentation of hpcl/iocl exam. my mail id hihi_kiholo@rediffmail.com
If i have 4 Allen Bradely make RS logix 5000 PLC and for viewing that we are using 4 RS view SCADA for 4 different packages. Now, I will want to view two packages on only one SCADA. Then how i will do it?