Questions :-
HR-
Q.1 about yourself & family background ?
Q.2 Why u choose Power sector as ur carrier starting not any
other sector ??
Q. 3 What think abt NTPC ?
Techincal Questions:-
Q.1 about Vocational Training……What u did , see the main
equipments….etc
Q.2 Why a transformer Noise during its running condition ?
Q.3 about transformer oil material & Test name for the
measurement of its dielectric strength & wht will u do if
its dielectric strength goes low ? ……..some discussion type ?
Q.4 What is relation between transmission lines &
Communication lines ?
Q.5 Which Machine u will prefer to use at a place where
flammable gases are coming out & why ?
Q.6 how fault in an electric system is detected & hw
protection of equipments is done ?
Q.7 Why we didn’t feel electric shock in an electric train ??
Q.8 Anything u want to ask from us ??
Answer Posted / alok
please send answer to.. alok.dixit@yahoo.co.in
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
1.why we are using blocks in withoutgaplightning arrester 2.why we ar using bushing in withoutgap lightning arrestor
Brief me about maintenance planning & sheduling of machine tool.
WHAT IS THE PARTIAL DISCHARGE TEST?
What is referred to the electron in the outer orbit?
What are the disadvantages of thermal power plant?
what happened when we supply a dc current in dc motor?? can it worked properly?
i want to run 11kv star connected motor in 6.6kv with delta connected throught inverter, is it possible?
A cotter joint is generally used to transmit
1.WHAT IS A SMART CAPABLE DB ( DISTRIBUTION BOX) ? 2. HOW TO DECIDE THE TYPE OF DB TO BE USED ( RECESSED/ PLUG TYPE/ SMART ETC ETC? 3. WHAT IS MILLENEUM BUS BAR USED IN DB? 4.DIFFERENTIATE MCCB AND MCB.
What is the unit of attenuation?
If SFU is Switch Fuse Unit, What is the expansion for FSHF in Electrical Engineering?
What are dcs and plc?
At full load wat is the motor p.f And at no load will is the motor p.f?
Dear All, I am new in construction company , my boss ask a question at time of interview , If we have 60MW generation and Single Power Transformer step-up we have. if CMR 50/60MVA , ONAN, ONAF respectively , is it sufficient or not ? for that much power to transfer,
What if the difference beween internal and exrteranal LBB?