Answer Posted / sage
You can start by asking this question at the right places
| Is This Answer Correct ? | 57 Yes | 13 No |
Post New Answer View All Answers
how do we design mix ratio?
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
How to calculate material and labor required for 100 m2 plaster?
What is the difference between linear dimension and aligned dimension?
What is unit weight of normal concrete?
please send me bhel questions on rupesh.017@rediffmail.com
what are the challenges of being a team leader and a supervisor?
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
what is diffrence between catchment area,watershed and basin?
What are the advantages of cad software’s?
what is the steel difference between np-2 and np-3 pipes and weight also
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
What is the withdrawal force of steel nails?
Formula of mid span bar
In Rcc ratio calculation I wanted to know quantity of Steel also.