mix proportion of M20 AND what are different grades below it
Answer Posted / dharvinder singh
M25 1:1:2
M20 1:1.5:3
M15 1:2:4
M10 1:3:6
| Is This Answer Correct ? | 69 Yes | 12 No |
Post New Answer View All Answers
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
What is rate of concrete surface rendering work per sqm
how to prepare site mix design
What is passive earth pressure ?
What is structural frames or systems?
What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
how to convert sand in Cft to Kgs
What are some facts about concrete?
Define What is the difference between routing maintenance and major maintenance in school facilities?
how to calculate load bearing column
what is modular brick and it size
why top layer of block work shoud be full size if any cut block adjustable than another layer?
Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.