Answer Posted / giri
super structure is the part of the stucture which is above
the ground level
| Is This Answer Correct ? | 7 Yes | 6 No |
Post New Answer View All Answers
Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....
what is escalation?how it is done?
who to find building iron rod strenth
foundation details for 25 ton weight Furnace on 2 supports and 2 tilters
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
need to join coaching institute in coimbatore tamilnadu ......say me the best coaching for IAS
is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.
what is the difference between prime coat and tack coat in road construction
What you understand by building codes?
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet
use ofr concrete as per grade ?
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.
Can inverted beams used in pipes during construction? If yes, explain how it can be implemented?
A doubly reinforced concrete beam is 25 cm wide and 50cm deep to the centre of tension reinforcement. The centre of compression is steel is 5cm from the compression edge. The areas of the compression and the tension steel are 10.16cm2 and 12.56 cm2 if m=18 and the bending moment at the section is 7,000,000 N-cm. Calculate the stress in concrete and steel.