from what stage you will start automation in your project
Answer Posted / murali
When the application is stable enough. i.e., when the UAT
is done and one phase of the application signed off.
That particular phase can be automated.
Before automating one need to consider the points
Need to be automated
-> Can be automated
-> Cannot be automated
Technically difficult
Need not to be automated
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Can QTP be used for GUI testing ?, We are using Java with MySQL and Operating system is Linux. We are NOT using the web.
How many types of recording modes in qtp? Which will be used when?
What is Associate Repository in QTP 9.2 ?
Hi Every body please explain me in steps to use checkpoints and object Repositories in QTP for Flight Reservation application please tell me the steps for this its urgent pls thanx for urs answers
How many ways we can parameterize data in quicktest professional?
how do you parameterize search button from the website? the page is a single winobject and i have made a virtual object button of search button but search box can't be converted into a winedit and if we try to convert it into winedit the value we enter in a searchbox appears as numbers in the script so we arent able to parameterize.help!!!
How to integrate the qualitycenter with qtp
Give me some real time point of way where exactly we can conduct audits?
explain abt dyanamic changing object with example?
Hi All, How to Compare two strings character by character in QTP
When we r doing data driven test with chkpts, i want to insert formulae in data sheet but i didn't get. How we wil do that plz. explain in detail.
For which type of projects the iterative model is not suitable?
What is the use of sendkeys and what are send keys
The hybrid framework can be implemented for any application. Is it true?
What is the differences between image check point and bit map check point?