Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the function of Lightning Arrester & Wavetrap in
Power system ??

Answer Posted / atul mishra

To protect human life and property, design engineers have to
install lightning protection systems on every GRID
SUB-STATION . The main function of the system is to capture
the lightning stroke, over voltage and then conduct
discharge current safely to the ground. Since there are 100
lightning discharges to the ground every throughout the
world, installing lightning protection systems are very
important for safety to human life and station

Is This Answer Correct ?    21 Yes 10 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

i am completed in B.E(Electrical and Electronics Engineering) with 8 months experience in Quality Control Engineer at Bharathi Industries,Coimbatore.

1891


if sf6 gas low in gis what will happen

825


how cables go in and come out for distribution from the feeder pillar box?

2085


What will be the impact on motor performance if a LT motor is rewound with changed motor winding data as given below:- Original winding data: total 04 wires = 02 wires of 17 SWG + 02 wires of 16.5 SWG. Changed Winding data: total 03 wires of 15.5 SWG wire size Motor rating: 160KW, 740RPM, 415V, ID FAN application. Normal Running Current = 95% of FL Current.

2040


We have received supplies of the ordered material. payments against the supplies also released. Where ST paid 4% against form C. Meanwhile it has been observed that 25% of material supplied was defective. Please suggest whether the issuance of C form from our side would be stopped till settlement of liabilities.

1954


what happens if earth of 33kv cable is not connected to earthing pits? please send this query's answer to ngrm.sudha249@gmail.com

2031


can the measured percentage error during calibration of single phase energy meter be negative?

2408


How to calculate MCB Breaking capacity.

1521


aternator every parts and its working

1625


Is it possible to connect a safety device in to parallel?

2153


What do you mean by an instrument transformer?

1081


Ac generato how produce power I need for camplet defination

1756


What is the effect on in Zone and out zone fault if Phase side CT is Vk/2<30 mA and Neutral side is CT is Vk/4<30 mA for Transformer REF protection

3813


what happens when series resonance occurs?

1847


Give me the calculation steps to design an electromagnet to be work in 230V 50 Hz AC Supply. Also give force that is created by that electromagnet when it gets energized.

2214