Answer Posted / satish m. patel, bilimora
It is the branch of engineering.which is the deals with
measurement, monitoring, display (etc.) of the various of
energy exchanges which take place during process operation.
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
why we are using magnet for calibration of gas detector?
What is loop1 and loop2 in MTS LT?
How will you calibrate an Absolute Pr.Transmitter of range 400mmHg absolute ?
i am from instrument branch i want paper patern of mahagenco . any pevious years paper regarding my branch send me please . please.....
Hi, Is there any smart plant instrumentation design training institute in Bangalore?
1.can you use SCADA instead of DCS,DCS instead SCADA 2.Difference between DCS and PLC,can their role be reversed i.e. role interchange 3.Difference between RTU and PLC
can you provide me full detail about instrumentation in ONGC??
How to Calibrate Ultrasonic Level Transmitter in field
What is intrinsically safe system?
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
selection of the zener barrier for the hazardeous area zone 0
how to design orifice plate?what is the equation?
how u choose thermowell lenght n pnumatic C/v size?
what can of fault ofently come in vibration mesurement?
Instrument QA/Qc what is the project quality plan?conduit inspection RFI. which documents attache with package?