what is the process of repair the structure in whitch
reinforcement is open
Answer Posted / jayshankar dwivedi
Situation is called honeycombing. Prepare a mix with GP2
and apply on portion
| Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers
How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
what is the use of steel rods of 16mm or 20mm used for 4.45mts for closing gutter.one mate consumes how many kgs with a gap of 6inches.
what is the water-cement ratio of mix design while 30mpa in 7 days?
How much material will consume for following specification water tank (9*7.5*6 feet)?
Did any of the egyptian pyramids ever fall down?
can i get civil engineering test papers.......?????
Slab quantity
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need
what is high type road and low type roads
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
How to find permissible diagonal tensile stress in reinforced brick work
Explain the various stages of the project planning process in construction?