how to consider the lap length of a bar in IS code.
Answer Posted / jayshankar dwivedi
As mention earlier
| Is This Answer Correct ? | 2 Yes | 4 No |
Post New Answer View All Answers
Questions related to civil.engg in company
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
what is stressing
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)
What materials were used to build the golden gate bridge?
what is a well
what is the maximum number of course that can be laid according to IS code and the max height.
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
Process of pcc in wateredug
length where bent up is made in slab of bridge from one end