Do you know differenence between design mix and nominal
mix?
Answer Posted / jayshankar dwivedi
In Nominal Mixes proportion og ingredients for a particular
grade of concrete is fixed for eg. M10 proportion is 1:4:8
Where as in design mix for a particular concrete we decide
proprtion on varios parameters like water cement ration
size of aggregat workablity etc. Trial mixes are taken and
check for there stregnth. For low grade concrete,nominal
and less important work we prefer nominal mixes
| Is This Answer Correct ? | 50 Yes | 9 No |
Post New Answer View All Answers
An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.
What is Joule Brayton Cycle?
why is M30 grade Concrete use for Foothing & Column M50
what is the name of shuttering oil used in oman
How did the romans get water up hills using aqua ducts?
What is high adherence steel bar? I have a general specification which refers to High Adherence steel bars, coils and meshes to BS EN 10080 and BS 4449 or BS 4483. Is this just general re-bar or is there something different about it? The spec originated in France.
What are the advantages of building a dam on the river nile?
what is the percentage of silt in black cotton soil.?
What are the advantages and disadvantages of using plastic and timber fenders?
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
GIVE US YOUR FULL DETAIL OF THE FOLLOWING… FULL NAME.. PERMENENT MAILING ADDRESS DIRECT CONTACT NO E MAIL ADDRES.
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)
What is the difference between engineering stress and true stress?