Which IS code is saying the detail of deshuttering period?
Answer Posted / raghavendra
In IS 456-2000,clause-11.3.
| Is This Answer Correct ? | 22 Yes | 0 No |
Post New Answer View All Answers
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
What is factor not to be taken in consideration in mix design?
What difference comes in constructing of house and a housing complex like society
Why Should Curing Not Be Done By Ponding And Polythene Sheets?
Did any of the egyptian pyramids ever fall down?
how can we construct building without foundation providing only grade beam at ground level
what is the procedure of wet seiving. n percentage of silt in different type of soil?
Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct
what is Brest Wall?
What is componsation
How to find permissible diagonal tensile stress in reinforced brick work
how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.