Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How much Fault current can be contributed by a motor?

Answer Posted / rajnish rauthan

it is a breaker used for arc extinguish through sf6 (sulfer
hexa fluoride)when any fault in our line or we can say when
contect r make & break.

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is meant by 2 within a star in a voltmeter dial?

2046


a governer in an Ic engine controls the

1173


How can a equal potential zone be carried out in conductors?

1314


how to prepare the technical test

2071


How to do maintenance of transformer feeder.

1844


what is the electrical?

2088


Why derating factor os applied on Cables?

1940


hai friends i have BSNL JTO exam on next month so if any body have model question paper or give preparation tips to my mail id kumar4486@yahoo.co.in this will helpfull for my future .plz & thank u by kumar

1970


why impedance relay is used for medium transmission line protection

2305


Single phase and threephase power calculation

2129


my question is how to answer the question "you are from b.tech eee background and why do you want to go for banking

1322


what is a power factor?

1793


How to calculate VCB rating for 33KV ,25 MW Power line?

1727


what are symmetrical and non symmetrical components in electrical installation.

2064


A generating system will have a total capacity of 300 MW. Find the probable forced outage when the capacity is supplied by two 150 MW units. The operating probability of all units is P=0.98 and forced outage probability rate Q =0.02 .

2624