Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how to calculate the capacitor rating for improving power
factor

Answer Posted / engr. tariq

Formula :

C = P (tan|old - tan| new) divided by Omega (w) and then
divided by Voltage (RMS) or Vrms.

theta (|) can be calculated by knowing cos theta OR power
factor. Example PF is 0.77 then Cos theta = 0.77 and Cos
inverse (0.77) = 39.646 = Theta OLD. Now

Now if i want to improve PF to 0.9 then theta = Cos inverse
0.99 = 25.841 = theta New.

After calculating theta put it in the Given formula to
calculate Capacitance required.

Is This Answer Correct ?    11 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

where was current transformer protection units used and why??

2080


Define damping ratio.

1310


what are the tests comes under the type test, what tests comes under routine tests.

1520


i want to run 11kv star connected motor in 6.6kv with delta connected throught inverter, is it possible?

2087


What is the importance of earthing?

1159


what are the accessories need to be added while doing estimation for the following: 1.MCCB 2.MCB 3.ACB

2138


Y phase plates are used in transmission line??? what is there need???

2973


Either the Armoured Earthing strip of HT 3 core cable have to pass through CB CT or not , why ???

2134


What is the need of earthing transformer for delta side of a transformer. (Think of a line section between a star/delta transformer at a grid substation and delta/star transformer at a village. An earthing transformer is there at the delta side of the star/delta transformer at grid substation). As there are no ground reference there will not be fault current if a one phase is grounded. Further L-L phase will be sensed by the primary side of star/delta transformer as a L-G fault. So why an earthing transformer is required at delta side

1514


working principles of cf lamp,incandescentlamp and f lamp?

2311


how can tell us the AC indoor or outdoor which Tr and formulls

1814


How many types of instrument cables are there?

1130


What is meant by derating factor?

1288


Please explain, how to test vector group of tranformer(Delta y1) . Thank

1752


What is Electrical Grade Aluminum for Tubular BusBars. i am confused between 6063 and T6 or T5 and what is BS 2898 and BS 159?

1881