What is the difference between nominal mix and design mix?
Answer Posted / miidangriika
Nominal Mix can be said as the mix prepared as per the
given standards in IS
Whereas Design mix is something which is prepared based on
the availabilty of the quality or type of the aggregates
(both coarse and fine) found on that locality or nearby
vicinity to meet the requirements of the strength of the
concrete.
There is no hard and fast rule for the quantity of the
materials should be either based on volume or weight.
Is This Answer Correct ? | 40 Yes | 21 No |
Post New Answer View All Answers
what is mc arther pile?
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
What is Heavy Concrete & Normal Concrete
What are the joints wants to made in masonry where door opening, arches like etc..
How many pyramid in egypt?
Which is the most prominent tower of world?
What is the ratio of grades m5, m7.5, m10, m15, m20, m25, m30, m35, m40?
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
How to come 1.54 from dry to wet concrete?
Which prize is the alternative to the NOVEL Prize?
what is the use of beam end forces while using a staad ? wha they are show
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,