Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

WE are using a 63A MCCB(SIEMENS MAKE) for one of the feeder
in LV substation panel.It is supplying to a lighting & power
socket DB.Settings in the MCCB is Ir = 63 * 1 , Isd = 8
times of Ir , tsd = 0.5 sec( I2 t off).
Sometimes this MCCB is tripping .But no trip in DB MCB.
Can anybody tell me reason ?
From where i can know about the MCCB settings?

Answer Posted / naveen sahariya

This may be due to absense of discrimination feature in
DB.or cascading is not as per requirement.better to have a
word with siemens engineer

Is This Answer Correct ?    1 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Differentiate between voltage and current feedback in amplifiers?

1095


What is proportional controller?

1278


what is the difference between circular wdg & ractangular wdg?

2030


What is the phase relationship between the primary and secondary voltages of a transformer?

1065


Define conversion efficiency of a power amplifier. What is its value for class c power amplifier?

1332


The efficiency of a 100kva transformer is 0.98 at full load as well as half load , for this transformer what is the Copper loss at full load ?

2315


How can get elongation of 2 k.G aluminium, if elongated aluminium dia is 2.5 mm?

2279


WHAT IS AIR GAP VALUE IN MM FOR A 11KV BUSHING OF 11KV/440V DISTRIBUTION TRANSFORMER. AND AIR GAP VALUE OF 25 KV BUSHING OF AT TRANSFORMER OF 25 KV TRACTION. WHAT IS THE CALCULATION FOR THE AIR GAP PERMITTED FOR BUSHINGS AT DIFFERENT VOLTAGES.

3464


Please provided formula for calculate the cable size from step up transformer to M.V panel, run overhead aluminum cables, total load is 5mega watt, total length 900 feet.

1747


can i connect the two phases of scott connected transformer,if not why?

1956


Enlists the applications of sampled data systems?

1074


give some advantages and disadvantages of combiniing the session, presentation, and application layer in the osi model into one single application layer in the internet model

2691


my diploma certificate in my higher education college

1604


What are the difference between CT/PT operated Meter and RRAMR Meter for HT/LT application?

2585


number of I/O devices in siemense plc

2123