Hi how r u ? hope you are fine there . Please can u tell me
tha Design life of Buildings as Per ACI CODE 318-99. It
will be a pleasure for me .Thanks in advance
Answer Posted / mks
100 yrs
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
What is thumb rule in quality and quantity estimation of a Residential building??
what pressure the NP2 class RCC pipe can sustain?
five benefits of using standard terminology in the measurement process
how to nfind out the specific gravity of sand.aggregate,water please help...
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?
how many litres of enamel paint required for 5000 sft of site??
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
how to tie 10 legged stirrups
how to design and calculate materail quantity for concrete speedbreaker ?
What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?
How long does it take concrete to harden?