Answer Posted / naresh thakur
28.8 bags.
Is This Answer Correct ? | 27 Yes | 0 No |
Post New Answer View All Answers
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
Permissible wastage of cement as per IS code ? In which IS code I get it?
how to prepare site mix design
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
what is raft foundation
it is possiblee to produce concrete with out cracks...
What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
What expenses counted in contingencies and how much it is in related to built-up area of the building.
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
significance of specific surface area of particles?
How much the quantity of Dry material of Crush for 1:2:4 Concrete, using pan 3/8'' down....
five requirements of infill panels for walls?