Answer Posted / sushant s das
It is temporary structure for construction wprk take place
in high altitude where man is unable to work from NGL.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
what is thumb rule for calculating the size of ISMB required for a particular length of span
What is reinforced concrete?
What is an ortho mode?
As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.
Why should pumping be not used in case of concreting work?
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??
3. What are the disadvantages of your present job, things you do not like about it?
How to compute minimum number of columns required for a site from area of site?
what is escalation?how it is done?
mix design procedure for 1:6 cement mortar
questions with answers to face an interview of an civil engineer regarding RCC buidings
how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?
how to calculate the scour depth
what is the water-cement ratio of mix design while 30mpa in 7 days?