Answer Posted / ashish
bus pt is control transformer which are required for
circuit control.because we can't use the high voltage in
control circuit.
Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
state basic meaning of 'INDUSTIAL AUTOMATION'?
How we can calculate the Amps for the cable Ex:- For 1sqmm wire how many amps we can draw (calculation)
WHAT KIND OF LIGHTENING PROTECTION SCHEMS CAN BE ADOPTED FOR THE FLAT ROOF OF BIG DIMENSION.
describe the Tranformer testing procedure
what is conductor copnstant of ab cable
what is the prinsiple of dc motor and construction and working ,application of dc motor.
1. transformer design formula ? 2. how to calculate the primary turns and secondry turns ? 3. core types ? 4. how to find the primary current and secondry current ? 5. how to calculate the stacking factor ? 6. range of fulx density ?
what is arc flash and what are the hazards involved
What is the basis for framing the rules of block diagram reduction technique?
what are the installation procedure of high voltage power transformer,CT,CB&PT?
what is the meaning of WYE and DELTA in Electric meter?
The 3 phase Delta connection RB=440V, BY=350V,.......* is Line to Line voltage RY= ? And Formula....?
Why 15Amp. MCB is suitable to carry load of 1.5Ton Ac please Explain?
- two pumps must work with them at the same time but if the first pump start the second pump must delayed for some time to start also , with motor rated power = 90 KW and rated voltage = 380 V and rated power factor = 0.85 lag please draw the power and control circuit for it and determine all circuit components parameters that you use it
what is the minimum pay scale for electrical engineer (building construction)in kuwait? plz revert back with yrs of experience & pay scale respectively.