what is the basic difference between a singly reinforce
section & a doubly reinforce section?

Answer Posted / b.murali krishan

Singly reinforced section the reinforcement is provided to
care tension in the bottom of beam further singly reinforced
members or beam are classified as underreinforced
section,balaced section and overreinforced section.If the
moment of resistance of the section is equal to the bending
moment than it a balaced section,moment of resistance of the
section is more than that of bending moment than it a
overreinforced section and If the moment of resistance of
the section is less then the bending moment than it a
underreinforced section.Doubly reinforced section is to be
designed to restrict the depth of beam(section) in case of
head room condition or if the bending moment is more than
25% of moment of resistance of the section doubly reinforced
section is to designed. in doubly reinforced beam or section
the reinforcement is to be provided both in compression and
tension zones.

Is This Answer Correct ?    81 Yes 12 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is progress payment?

700


how to caluclate sienerge qty in construction in ap

1893


What is construction mitigation management?

1830


Actually i am confused that how to calculate the bending moment for a semi-circular beam and curved slab.If any one have a good idea about the matter,please give the answer with a suitable example. Thank you......

1722


why is M30 grade Concrete use for Foothing & Column M50

2979






What is portland cement

7103


Basic questions of civil engineering

1616


rimmer in pile foundation

2126


can you give me the details of rate analysis of steel and concrete?

2464


according to the painting co efficient, we should take the one side of doors (or) windows or both sides?

1304


What are the advantages of cad?

633


how pumping of concrete effects the quantity of material used in it?

1286


Can a wave happen in the middle of the ocean like in the movie poseidon 2006?

684


How does a traffic light signal work ?

1828


If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?

1703