HOW TO FIND OUT THE QUANTITY OF CONCREATE
Answer Posted / ketan pune
QTY OF CONCRETE = VOLUME OF STRUCTURE
| Is This Answer Correct ? | 9 Yes | 9 No |
Post New Answer View All Answers
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
it is a corrected question." make a list of engineering property(properties) of soil.
WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?
Define What is the difference between routing maintenance and major maintenance in school facilities?
Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.
.5Ast
What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?
HOE TO YOU PLAN TO ACCHIEVE THE GOALS?
difference between trapezoidal and pedestal footing and how the load acts on that
define the strength
what is thumb rule for calculating the size of ISMB required for a particular length of span
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
may i know the detailed description of cutting length
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
what is the weight of 6000 psi concrete in lb/cft?