In an Interview I have been asked the following questions,
1) How would allocate job to your team members if you are
assigned a role of Team Lead.
2) The second question was, do you follow any technique for
the distribution of time while assigning jobs to your team
members.
For, both the questions I was clueless to answer.
Please give me a practical approach for the above questions.
Answer Posted / vijay
1.Based on the team member knowledge on the project,which
module he is expert, and his experience in the project and
domain, i will consider those things while assiging the job
to the team member.
2.In the test plan we have schedule,based on that we will
follow the timelines to finish the work.
we need to get daily or weekly updates on the project from
them,if they are not able to do effectively, arrange the KT
or walkthrough from developers or seniors.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
What is meant by verification and validation?
What are test driver and test stub and why it is required?
list potential risks that you have identified so far in Banking domain
Where I can get ITB/ISTQB sample question paper?
What is the difference between test case and test data?
What if the software is so buggy it ca not really be tested at all?
How to find all the bugs during first round of testing?
How do u calculate Schedule variance? What is the formula? Explain with Example
how cani do requirement testing using some testcase
what is Conventional SPMs
Explain what is a cause effect graph?
How to perform SQL inject test for a login page using OWASP ZAP proxy security testing tool
How do you perform integration testing?
How does a server or client environment affect software testing?
Kindly tell me some good websites from where I can study about sqa and testing(advance and new material)