1. drainage pipes
2. pipe accesories & auxillary structures
3. envelope materials
| Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
Please design 12.5m long dubbly beam
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?
Form where IS456 is adopted in 1978?
whats is difference between anchorage length and development length
Why joints are provided?
in one SQM plaster how much Cement and sand consumed in ratio 1:4
How much cement and sand required for 9"brick wall per square metre
Where can I get a Text Book on Design of Blast Resistant Buildings in PDF form.
how we calculate the grade of the Bituminous materials.?????
Define What is unit weight of normal concrete?
what are the types of dimensioning?
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
what is tension footing?