corrosion of reinforcement bars due to chloride attack and
its equation
Answer Posted / narendra
Corrosion is the oxidation of a metal in a normal
atmospheric condition owing to the excessive presence of
moisture and oxygen in the air. Corrosion of the metal is a
very natural and rapid phenomenon in areas of high
humidity, places close to the sea or in the presence of
saline water. Gaseous emissions in industrial area also
cause corrosion of the metal.
Chloride Attack
Chloride causes de-passivation of steel, leading to
corrosion.
Chemical reaction:-
Fe+++ 2 Cl→ FeCl2 (ferrous chloride)
FeCl2+ 2 H2O → Fe(OH)2+ 2 HCl
| Is This Answer Correct ? | 14 Yes | 1 No |
Post New Answer View All Answers
show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water
How do you calculate the unit weight of concrete?
I need to do a Compressive Strength Test for a specimen made of Rubber. Before doing the Test on the Machine, I need to have an idea of the Minimum and Maximum Compressive Strength or Yield Strength of the specimen. How can I calculate that?
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
Mention what are the composition of a landfill?
Slump Values for works?
What are the advantages of cad software?
Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
How many Sft of Level Plaster per Kg
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet
A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S
plz.show development and anchorage length in simple diagram.
What should be the standard roof height like to be?
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you