Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

In case of a beam ,main steel is provided along the longer
span because, bending moment is directly proportional to
length but why in case of one way slab main steel is
provided along shorter span while as bending takes place
along longer span?comment

Answer Posted / narendra

BECAUSE IN CASE OF ONE WAY SLAB THE LOAD IS TRANSFERED
THROUGH THE SHORTER SPAN ONLY.
AND
IT IS POSSIBLE TO DESIGN IT (MAI STEEL) ALONG LONGER SPANS
TOO BUT THE STEEL REQUIREMENT WILL BE MORE AND HENCE IT
WILL NOT BE VIABLE SOLUTION.9THIS IS THE MAIN REASON.

Is This Answer Correct ?    3 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level

2547


Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3

2003


1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?

2225


silt%= silt volume/ silt+sand volume is this right?

1984


The largest size of paper used in plotter to print the drawing made by Autocad .

1805


What is the use of offset command?

1098


how much cement and sand required for 1cum rr masonry

4924


very simple or less time consuming formula for reinforcement calculation by moment

1431


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2100


Explain moment of inertia?

1060


At what point does a circle start losing area when being flattened?

1059


How to avoid fly ash seed ball formations in the concrete mixer while mixing of raw materials for fly ash block manufacturing?

1838


what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght

1384


Explain what is Hybrid Foundation?

1131


How can you achieve soil enforcement?

1064