Questions :-
HR-
Q.1 about yourself & family background ?
Q.2 Why u choose Power sector as ur carrier starting not any
other sector ??
Q. 3 What think abt NTPC ?
Techincal Questions:-
Q.1 about Vocational Training……What u did , see the main
equipments….etc
Q.2 Why a transformer Noise during its running condition ?
Q.3 about transformer oil material & Test name for the
measurement of its dielectric strength & wht will u do if
its dielectric strength goes low ? ……..some discussion type ?
Q.4 What is relation between transmission lines &
Communication lines ?
Q.5 Which Machine u will prefer to use at a place where
flammable gases are coming out & why ?
Q.6 how fault in an electric system is detected & hw
protection of equipments is done ?
Q.7 Why we didn’t feel electric shock in an electric train ??
Q.8 Anything u want to ask from us ??
Answer Posted / amit.sonmale
Sorry ,will u pleas(HR) give me answer of this Q.
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
list of tests to be carried out at manufacturers end while purchasing a step up transformer of 11kv to 66kv ,2MVa Capacity.
If UG power cable both ends are to be earthed or what? If not why?
What should be setting for alarm,tripping and cooling fan on for power transformer's oil temp. and winding temp. indicator?
work of choke in florocent tube circuit ?
What is a dc motor?
Explain in brief description about the operation of DG sets.
can i connect REF and Differencial relay in 1 CT core for transformer protection?
typically in power distribution substation. 1- Any idea how would be the graph of capacitor bank consumption verses time through the day . 2- How is the switching ( on and off ) of the capacitor bank, per need?
What shall be the secondary output voltage if the primary winding of a 220/6V, 50 Hz transformer is energized by an 110V, 60 Hz supply?
when it is possible kvrah lead & fundamental kwh be equal in electonic trivector meters (3 ph)
How to calculate cable size by using load.?? Any formula...
Do closed loop systems require manual input?
concept of busbar and load dispatching..?
What do you mean by an instrument transformer?
While testing LA mast,What are the parameter limits ?