WHY FLEXI LINKS ARE USED INBETWEEN GENERATOR TERMINAL
OUTPUT & BUS DUCT CONDUCTOR.
Answer Posted / mi2
to avoid vib. of generator, & work as like fuse
| Is This Answer Correct ? | 2 Yes | 4 No |
Post New Answer View All Answers
what are the industrail measures to over ferranti effect? how would the ferranti effect the power system if those remedial mearsure arent taken? how often does this effect occurs in real power system?
If VFD is On but no starting commond on it. so how many outpout voltages of VFD
Please explain the following and how these are working with PLC unit 1.I/O Module 2.I/O Device 3.Adaptor Card 4.Ribbon Adaptor 5.RS 485-FC
what is difference between earthingpits,earthing grid & earthing mess?
In our factory so many iron pillors are exists for supporting the shed/Hangar. If do more no of earthings at one piller instead of doing more earth pits in many locations and running earth strip around the hanger, I can save the money. Please suggest this method is acceptable as per Is specifications though the Earth resitance of the farthest piller is with in the limits as per IS specifications.
how to find out 3 phase complex power in per unit in unbalanced system?
In power transmission using open belts or horizontal shafts it is preferable to have the slack side of the belt on the top because
hi i have applied for lic of india south cenrtal zonal ,hyd. i didnt get hall ticket till now.let me know how can i get form internet
What are the characteristics of negative feedback?
placement paper samples of mspl company
Why using synchronising methed in DG's sets?
CALCULATE THE TOTAL VOLTAGE DROP AND SELECT THE CABLE SIZE IN MM-SQARE FOR A PANEL-262KW AT 110 METER FROM THE SOURCE SUPPLY , SUPPLY VOLTAGE 240/415
In case of HV test on medium voltage cables, BS is asking for 4 U0 where as IEC is asking for 3.5 U0. Can any one advise me how this 3.5 times or 4 times U0 is derived?
which IS or IEC is used for earthing,breakdown voltage of transformer oil, hv/pd testing and all type of electrical testing
What is minimum permicible value of leackage current for LT Panle when applying voltage up to 3 KV for 5 Minuits?