Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is The meaning Of Auto cad And Also Define What Is
Drawing According To You

Answer Posted / hanish sehgal

auto cad is very important software of all civil engg auto
cad is used to design the buildings in 2d and 3d

Is This Answer Correct ?    100 Yes 40 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

very simple or less time consuming formula for reinforcement calculation by moment

1527


how much tempareture are required to make liquid state of pid leed

2281


is basic cost of the material includes tax?

2177


100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags

2477


1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25

2829


in design case of structural member best suitrable percentage of steel limit is what

1567


how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6

1530


What are the ingredients of pre-stressed concrete?

1302


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2140


std penetration resistance in very stiff clays lies bet 2 & 4 4 & 8 8 & 15 15 & 30

2065


why does the most of civil engg is not intersted to going for teaching field?

2136


what is a well

2036


how much quantity of cement,sand and water required for 1 sq feet flooring work .

2553


What is the difference between one-way slab and two-way slab?

1398


do we decide reinforcement steel , based on bending moment ? give example with continous slab?

2423