if 20 hp motor starts directly stars and contenious run .
what will be the effect.
Answer Posted / hari
DIRECT STARTING WITHOUT STARTER IS POSSIBLE FOR DOL type
windings only,not for double cable motors.sudden load will
effects the transfomer and other electricl accessories.
| Is This Answer Correct ? | 1 Yes | 4 No |
Post New Answer View All Answers
hello friends.. I have a doubt regarding the operation of dc machines.. I studied in a text book that a dc machine can be used as a generator and as a motor.. is this possible? If so,please send me the info about this topic.. you can also send your info to my mail.
explain comutator action in detail.thanks
How to calculate loses in transformer of 160 KVA ?
why the electrolyte level in lead acid battery is maintained 2.5 cms above electrodes?
In Power cable specification what is U0/U and Um.
how hydrogen cooled alternator undergo maintanence ? that is hydrogen when come in contact with air can result into explosions .
WANTCONTACT NUMBER & EMAIL/ WEBSITE TO CONTACT THE SECRETARY,MADHYA PRADESH LICENSING BOARD(ELECTRICAL),K- BLOCK,3RD FLOOR,SATPOODA BHAWAN,BHOPAL
i need project topics along with circuit diagram in the electrical and electronics engg and also some websites regarding projets.
Why insulation level follows this order? transformer < bus bar < circuit breaker & Isolator < transmission line.
How do i carry out or know the vector group of a Dyn1 and Dyn5 transformer
Define early construction of human being
WHAT IS VCB SAFETY
why servomotor motor? where i apply for best output?
please send me jindal previous aptitude and technical question and answer.my email id is deep_raj@live.com
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.